01 / OVERVIEW

Film productions and live events require dependable temporary power across changing locations, schedules and load conditions. Lighting, video walls, sound systems, production equipment, HVAC and support areas can create short periods of high demand followed by long periods of relatively low consumption.

​

Generators are often sized for the largest anticipated load and then operated throughout the production day or event window. This can result in extended low-load operation, unnecessary fuel consumption, frequent refueling and generator noise near production crews, performers and attendees.

​

ChargeHives™ provide mobile battery power for film, broadcast and live-event applications. They can operate from available venue power, alongside a generator or as a stand-alone power source for a defined operating period.


This allows temporary power capacity to be matched more closely to the production schedule while supporting high-demand equipment, quiet operating periods and overnight loads. This brief outlines how ChargeHives™ can support film and event applications through venue-supported, generator-hybrid and stand-alone configurations.

ChargeHive HiveCore mobile battery system positioned near film production trailers and support equipment.

Figure 1: HiveCore™ being positioned pre-site inspection

02 / DEPLOYMENT

How ChargeHives™ Are Deployed for Film and Events

ChargeHive™ deployment is based on the available power source, production schedule, load profile and required operating duration. The system can be configured around three common temporary-power conditions.

​

Limited Utility Power: ChargeHive™ supplements available venue power when the existing electrical service cannot support the full production or event load. The system can recharge during lower-demand periods and supply additional power when lighting, sound, video or other equipment increases demand.​

Best suited for: Venues with limited electrical capacity, temporary installations, remote production areas and applications where installing additional utility service would be impractical.
 

Generator Hybrid: A smaller generator supplies sustained demand and recharges the ChargeHive™ when capacity is available. The ChargeHive™ supports short-duration peaks and changing production loads, while stored energy can supply the site during quiet periods when the generator is turned off.
Best suited for: Remote productions, outdoor events, extended operating schedules, intermittent high-power loads and locations where generator noise or refueling creates operational challenges.

​

Stand-Alone Mobile Power: A precharged ChargeHive™ supplies a defined production period, event window or dedicated group of loads without an operating generator. The unit can be recharged from venue power, an available electrical source or a generator between operating periods.
Best suited for: Sound-sensitive filming, audience-facing areas, overnight production support, broadcast equipment, lighting departments and temporary power zones where generator operation is undesirable.

Limited Venue or Utility Power

VENUE-SUPPORTED CONFIGURATION

Venue-supported ChargeHive configuration supplementing limited electrical service for film production and live event loads.

VENUE POWER

CHARGEHIVE

PRODUCTION LOADS

ChargeHive supplements available venue power when the existing service cannot support the full production or event load.

BEST FIT

Limited venue service, temporary installations

Generator Hybrid

HYBRID CONFIGURATION

Generator hybrid ChargeHive configuration supplying film production and event loads while supporting peak demand.

GENERATOR

CHARGEHIVE

PRODUCTION LOADS

A smaller generator supplies sustained demand and recharges the ChargeHive. The battery supports peaks and generator off-periods.

BEST FIT

Remote productions, outdoor events and peak loads

Stand-Alone Mobile Power

BATTERY-ONLY CONFIGURATION

Stand-alone ChargeHive battery configuration supplying film production and live event loads without an operating generator.

CHARGEHIVE

PRODUCTION LOADS

A pre charged ChargeHive supplies a defined production period or event window without an operating generator at the point of use.

BEST FIT

Sound sensitive filming and audience facing areas 

03 / SITE PROFILE & OPERATION

30-Day Remote Film Production

24-Hour Daily Load Profile

DAILY ENERGY

400 kWh

AVERAGE LOAD

25 kW

PEAK LOAD

150 kWh

Operating hour

1

2

3

4

5

6

7

8

9

10

11

12

Hourly average demand (kW)

5

5

5

5

5

5

18

20

22

24

52.5

24

Operating hour

13

14

15

16

17

18

19

20

21

22

23

24

Hourly average demand (kW)

22

20

23

28

52.5

18

13

13

5

5

5

5

24-hour film production load profile showing 400 kWh daily energy demand and two 150 kW production-lighting peaks.

30-Day Remote Film Production

Project type

Multi-week on-location film production

Supported loads

Production lighting, video village, DIT equipment, trailers, HVAC, catering, communications and security

Electrical service

480 V, three-phase temporary distribution

Peak demand

150 kW

Peak duration

Two 15-minute production-lighting events per day

Average active-period demand

25 kW, including peak events

Active production period

14 hours/day

Overnight baseline demand

5 kW for 10 hours/day

Daily energy demand

400 kWh

Operating schedule

24 hours/day

Project duration

30 days

Conventional generator

175 kW prime diesel generator

Conventional operation

Continuous, 24 hours/day

30-Day Remote Film Production

Project type

Multi-week on-location film production

Supported loads

Production lighting, video village, DIT equipment, trailers, HVAC, catering, communications and security

Electrical service

480 V, three-phase temporary distribution

Peak demand

150 kW

Peak duration

Two 15-minute production-lighting events per day

Average active-period demand

25 kW, including peak events

Active production period

14 hours/day

Overnight baseline demand

5 kW for 10 hours/day

Daily energy demand

400 kWh

Operating schedule

24 hours/day

Project duration

30 days

Conventional generator

175 kW prime diesel generator

Hybrid generator

45 kW prime diesel generator

ChargeHive

HiveCore, 260 kWh / 140 kW PCS

Battery round-trip efficiency

90%

For this application, a HiveCore™ is paired with a 45 kW prime diesel generator in place of the existing 175 kW generator. The generator supplies sustained site demand and recharges the battery whenever its available output exceeds the active load. HiveCore™ supplements the generator during higher-demand periods, including production-lighting events and site peaks up to 150 kW. During lower-demand and overnight periods, stored energy can supply the production compound while the generator is turned off. This configuration provides on-location battery charging without requiring a separate utility connection or taking the system out of service to recharge.         

Operating Condition

System Reponse

Demand below 45 kW

Generator supplies the load and uses available capacity to charge the HiveCore

Demand above 45 kW

HiveCore supplements the generator and supplies the difference

Peak demand up to 150 kW

The 45 kW generator and HiveCore operate together; HiveCore supplies up to approximately 105 kW

Low-demand and overnight periods

Battery reserve is reached

HiveCore can supply the 5 kW baseline while the generator is off

Generator restarts and supplies the load while recharging the battery

04 / RESULTS

Operating and Cost Impact

Cost Assumption

Generator configuration

Generator rental

HiveCore rental

Diesel price

Monthly Fuel Cost

Generator runtime

Fuel consumption

TOTAL ANNUAL SAVINGS

$75,288

Estimated direct operation savings

GENERATOR TIME REDUCTION 

50%

Per month

Conventional

175 kW generator

$7,000/month

Not applicable

$5.50/gallon

$12,672

24 hours/day

76.8 gallons/day

MONTHLY EQUIVALENT SAVINGS

$6,274

Per month

DIESEL AVOIDED ANNUALLY

16,416

Gallons, approximately

Hybrid

45 kW generator + HiveCore

$2,000/month

$6,250/month

$5.50/gallon

$5,148

Approximately 12 hours/day

31.2 gallons/day

FUEL REDUCTION

59%

Approximately

GENERATOR HOURS REDUCTION

4,320

Hours annually, approximately

Costs are based on specific equipment rental rates, manufacturer fuel-consumption data and the modeled site load profile. Actual performance and pricing will vary by project, equipment configuration and location.